Lashao gold mining area

  • 时间: 2024-09-01 16:19:53
  • 【字体:
  • 阅读次数: 310
  • The project is located in Kangge County, Polakanse Province, Laos, Southeast Asia. The group is responsible for the underground mining work (8B, 5B&6, 2&3, 8A, 8C, 7, 5A) of the mining project. In 2021, the mining output will be 150000 tons, in 2022, the mining output will be 540000 tons, and in 2023, the mining output will be 1450000 tons. It is estimated that all the cave mouth mining work will be completed in 2027.






    收藏:
      (0)
      分享:
    • 上一条: 联系我们
    • 下一条: 经营许可证
      • 联系
      • 电话: +856 20 55573188
      • 地址: 老挝人民民主共和国万象市西科达崩县巴堂村
      • 备案编号: 滇ICP备2024038738号-1
      • 版权: 老挝英菲迪集团有限公司  2024-2027 Copy Rights

      • 微信公众号
      老挝英菲迪集团有限公司